product Description
XF-80 Concrete Recycling Plant help process waste and returned concrete into renewable resources by separating concrete into sand, stone and slurry. It can provide a cost saving advantage for its users by recycling concrete components as well as protecting the environment.
For XF-80 model concrete recycling plant, the washing system with single parking lot for mixer truck. The concrete recycling plant is composed of separation system, water supply system and electrical system. It is mainly used to recycle the sand, stone and cement in the waste concrete and clean of the concrete mixer truck.
The slurry can be furthered processed into clean water by filtration through sedimentation pits or entirely reused in concrete production by storing them in agitated pits.
The Concrete recycling plant is the core equipment of concrete recycling system.
Parameter
Model | XF-80 | XF-100 |
Screening Capacity (t/h) | 10-20 | 20-30 |
Separate Stone Size(mm) | >Φ5 | >Φ5 |
Separate Sand Size(mm) | Φ1-Φ5 | Φ1-5 |
Total Power of Motors (kw) | 10 | 12 |
Weight (t) | 5 | 7 |
Overall Size(mm) | 5100*1570*2000 | 6360×1750×2393 |
Qty. of Mixer Trucks | 1 | 10-30 |
No. of Washing Parking | <10 | 2 |
Electric Control System | PLC Auto Control | PLC Auto Control |
Features
- It can solve the pollution problem effectively and can save the precious architectural materials.
- PLC electronic control box adopts the European advanced technology,so this product achieves automatic control on the whole process.
- The sandstone can be separated completely at one time
- The washing water can be recycled , so there is no discharge of the sewage.
- The sieve is convenient to assemble and not easy to be rusty and blocked.
Working Process
When the mixer car back to the set parking, the system will inject water and flush automatically. After roller washing, pour the waste water into the feeding hopper directly. Then clean and separate in the separator, and the separated materials were sent to the outlet respectively. Overflow water flows into sedimentation tank from the drainage ditch, then withdraw back by pump after three stages precipitation, and then recycle. The whole cleaning process of the mixing truck is about five minutes.

Factory Strength







